In short
If you are building a house where the sewer does not reach, the waste disposal system goes inside the permit, not separately. The Joint Regulation calls SIDDD four things: a septic tank with a seepage well, with percolation trenches, with percolation beds, or a retention tank. Nobody may build or modify one without OGPe authorisation. The system’s information and plans are filed with the dwelling’s construction permit application, and the operation part with the Permiso Único application. The plot plan must show concrete distances: extraction wells within a hundred metres, and water bodies, springs, sinkholes and wetlands within a hundred feet. There is an inspection that cannot be skipped: the system is inspected when construction ends and before it is covered with fill. And there is a sentence that matters to buyers: whoever acquires a property with an authorised SIDDD acquires its obligations and answers for any prior contamination.
What is it?
It is Chapter 9.8 of Joint Regulation No. 9473. SIDDD stands for Individual Domestic Waste Disposal System, and the chapter applies to every construction permit application for an individual dwelling that has one, and to modifications or remodelling of existing dwellings involving changes to the system. Activities covered by DRNA’s Underground Injection Control Regulation are excluded; if your project involves a system or activity covered by that regulation, those permits are obtained from DRNA.
Who can do it?
Every project or activity involving the construction of one or more individual dwellings, where each dwelling will have a SIDDD, requires an authorisation for those systems. And the regulation puts it negatively: no person shall cause or permit the construction or modification of a SIDDD for an individual dwelling or residence without holding the proper OGPe authorisation.
Requirements
- Filing the SIDDD’s information, plans, specifications and design calculations as part of the dwelling’s construction permit application.Verified against the official source
- Filing the information relating to the system’s operation and use as part of the Permiso Único application.Verified against the official source
- Contracting a Construction Works Inspector and notifying OGPe at least five (5) days before construction is due to finish, so the system is inspected before it is covered with fill.Verified against the official source
- Filing the Authorised Inspector’s sealed and signed certification that construction matched the permit, and the owner’s or operator’s signed certification that they will operate the system per the operation and maintenance procedures.Verified against the official source
- Filing and obtaining OGPe approval of a Closure Plan before abandoning the system, and submitting the Final Closure Report within five (5) days of the closure.Verified against the official source
Documents you need
Cost
Step by step
Step 1: What counts as a SIDDD
The chapter applies to four configurations: a septic tank with a seepage well; a septic tank with percolation trenches; a septic tank with percolation beds; or a retention tank. It applies both to the construction permit application for an individual dwelling that has one and to modifications or remodelling of existing dwellings involving changes to the system. And it applies negatively: no person shall cause or permit the construction or modification of a SIDDD without proper OGPe authorisation.
Step 2: What this chapter does not cover
Activities covered by DRNA’s Underground Injection Control Regulation are not covered here. However, any project or activity regulated by the Joint Regulation that involves a system or activity covered by the UIC rule must obtain those permits from DRNA. They are two different counters and it is worth knowing which one you are at before filing.
Step 3: The system goes inside the house’s permit
There is no separate application for the septic system. The information, plans and specifications, design calculations and other documents relating to the SIDDD’s construction must be filed as part of the construction permit application submitted to OGPe for the dwelling. OGPe evaluates the application and, if it authorises the system, includes the requirements for its construction and operation in the case’s final determination. Everything filed must meet the design and construction criteria of the Codes adopted by OGPe.
Step 4: The plot plan and its distances
It is the most demanding piece and the one that decides whether the system can go where you want it. The plot plan, at a legible scale, sealed, signed and certified by the professional who prepared it, must clearly identify: the location of all system components with their length, width and depth; the line system carrying waste from the residence to the system; the distance from the components to boundaries, to the residence and to other structures; the neighbours’ names; the presence of flood zones on the property; and where the percolation test, the water-table determination and the soil study were done. Plus the access roads with kilometre and hectometre, and the potable water line that will serve it.
Step 5: A hundred metres and a hundred feet
Two different radii, and the regulation writes them in different units. The plan must identify extraction wells within a horizontal distance of one hundred metres of the system’s components. And it must identify water bodies — streams, rivers, lakes — within one hundred feet; springs on the property or within one hundred feet of the components; sinkholes within the property or within one hundred feet of it; and wetland areas within the property or within one hundred feet. The mixed units are the regulation’s, not ours.
Step 6: The inspection before covering
This is the one most often skipped and the most expensive to skip. Every SIDDD must be inspected once construction ends and before the system is covered with fill. For that the owner or their authorised representative must contract a Construction Works Inspector and notify OGPe at least five days before construction is due to finish. The inspector inspects all parts of the system under the applicable Building Code. If defects are found in materials, design, location or construction, the works owner must correct them and have the system re-inspected before covering it.
Step 7: The annual inspection and modifications
It does not end when it is covered. Every system to be modified to add components, expand its capacity or replace equipment must be inspected by an Authorised Inspector to verify the modification meets the regulation, the Building Code and the authorisation issued. And the Authorised Inspector must carry out at least one annual inspection of the waste management systems to verify compliance with the operation and maintenance procedures set in the Permiso Único.
Step 8: If you buy the house, you buy the system
The permit transfer section is one sentence and worth reading before signing: any person who acquires a property where the construction or use of a SIDDD is authorised acquires all the rights and obligations relating to it and is responsible for any prior contamination relating to it. That is, earlier contamination travels with the property.
Step 9: What is prohibited
The regulation lists eleven prohibitions. No person shall promote or permit: building or operating a SIDDD in breach of the regulation, of the permit’s conditions or of applicable state and federal law; disposing into the system of any substance or waste other than exclusively domestic waste; installing or using any device, additive or measure not authorised in the permit; abandoning a SIDDD without an approved Closure Plan, without the closure activities carried out and without the final report submitted; injecting underground so that a contaminant appears in an underground source of drinking water that may affect health or violate the federal Safe Drinking Water Act or DRNA’s Class SG standards; letting the system become inoperative or altering the manufacturer’s specifications or the conditions under which OGPe approved it; building or operating latrines or standalone seepage wells — wells receiving waste directly without a septic tank ahead of them; disposing into the system of runoff, rainwater, cooling water or condensate from refrigeration or air conditioning compressors; disposing of hazardous waste; building an underground-injection system in flood zones; and disposing into the system of waste from vehicle maintenance or repair, such as used oil, grease, solvents, fuel or petroleum hydrocarbon derivatives.
Step 10: Closing it, and the difference from a temporary closure
An owner or operator intending to close a SIDDD must file a Closure Plan with OGPe. Once approved, the required activities to empty the waste and close the system are carried out. Within five days of the closure a Final Closure Report is submitted to OGPe, certified by an Authorised Inspector that it was done per the approved plan and in compliance with applicable laws and regulations. And there is a practical exception: where the dwelling is temporarily closed, the SIDDD must be emptied and cleaned first, but that temporary closure does not require filing a Closure Plan.
Where to do it
Before OGPe, inside the dwelling’s construction permit application and, for the operation part, inside the Permiso Único application. Permits and authorisations in historic sites and zones, plazas and surrounding blocks — the towns’ founding centres — additionally require a recommendation from the Puerto Rican Institute of Culture. The chapter publishes no fees or decision deadlines, and this guide does not invent them.
How long it takes
What to do if something goes wrong
If you are planning the house, start with the ground: without the signed percolation test, water-table determination and soil study, there is no application. If the lot has an extraction well nearby, measure it: it must be identified if within a hundred metres. If there is a stream, spring, sinkhole or wetland, the radius is different: a hundred feet. If your project involves underground injection of the kind DRNA regulates, that permit does not come from OGPe. If the works are finishing soon, notify OGPe five days ahead and cover nothing before the inspection: if defects appear they must be corrected and the system re-inspected before covering. If you are buying a house with a septic system, bear in mind you acquire the system’s obligations and answer for any prior contamination. And if you are abandoning it, an approved Closure Plan and a final report within five days are needed; temporarily closing the house does not require that, but emptying and cleaning the system first does. Three caveats: we publish no cost or timeframe because the chapter fixes none; the general filing procedure lives in Volume II of the regulation, which we did not read here; and the file the Board links is titled "Reglamento Conjunto de Emergencia", but the document is Joint Regulation No. 9473 of 16 June 2023.
Common mistakes
- Treating the septic system as a separate procedure: it goes inside the dwelling’s construction permit application.
- Covering the system with fill before it is inspected.
- Not notifying OGPe five days before construction finishes.
- Filing the plan without identifying extraction wells within a hundred metres or water bodies, springs, sinkholes or wetlands within a hundred feet.
- Installing a standalone seepage well with no septic tank ahead of it: the regulation expressly prohibits it.
- Connecting rainwater, runoff or air-conditioning condensate to the system.
- Buying a property with a SIDDD without knowing you answer for prior contamination.
- Abandoning the system without an approved Closure Plan and the final report within five days.
Frequently asked questions
Do I need a separate permit for the septic system?
Not separate: the system’s information and plans are filed as part of the dwelling’s construction permit application, and the operation part as part of the Permiso Único application.
When is it inspected?
Once construction ends and before the system is covered with fill. The owner contracts a Construction Works Inspector and notifies OGPe at least five days ahead.
Can I have just a seepage well?
No. The regulation prohibits building or operating latrines or standalone seepage wells, meaning seepage wells that receive domestic waste directly and are not preceded by a septic tank.
I bought a house with a septic system. Whose responsibility is it?
Yours. Any person who acquires a property where the construction or use of a SIDDD is authorised acquires all related rights and obligations and is responsible for any prior contamination relating to it.
How is a septic system closed?
With a Closure Plan filed and approved by OGPe, the emptying and closure activities the plan requires, and a Final Closure Report certified by an Authorised Inspector within five days of the closure.
Official sources
These are the government pages this guide is based on.
- Oficina de Gerencia de Permisos (OGPe)
OGPe
docs.pr.gov
- Permit Management Office
ogpe
ogpe.pr.gov
Last verified
September 3, 2026
MiPRFácil is an independent informational website and is not affiliated with, endorsed by, or operated by the Government of Puerto Rico or any government agency.
MiPRFácil does not submit applications on your behalf.
Was this guide helpful?
Did you find out-of-date information?
The construction permit: what it asks for and why yours may not be “ministerial”
One permit covers urbanization, construction and demolition. If it is ministerial it moves fast; OGPe publishes exactly what disqualifies it.
How to apply for the Permiso Único (single business permit) in Puerto Rico
What the Permiso Único is, which endorsements it consolidates, how to apply through the Single Business Portal, and what usually delays it.
The variance: when your lot does not meet its district
There are two different variances and a hard requirement. The Joint Regulation says variances are not favoured.
Who can sign your permit: the Authorized Professional and Authorized Inspector
A private professional certified by OGPe can grant or deny your permits. What they can decide, what they cannot, and how to check their credential.
Flood zones: Puerto Rico’s two maps and which one governs
Puerto Rico uses the FIRM maps and, since 2018, the ABFE maps. For building or substantially improving a property, the more restrictive of the two always applies.