Skip to content
MiPRFácil
ESEN
Housing

Safe Plans: four house designs OGPe gives you for free

Last reviewed: August 15, 2026VerifiedOGPe

In short

When Irma and María struck Puerto Rico in September 2017, close to half of single-family homes were informally built: OGPe estimates that 47% of dwellings were built without formal plans and had not been designed by professionals. Most did not meet the minimum parameters of the Building Code and consequently had no construction or use permits. FEMA, in its MITIGATION ASSESSMENT TEAM REPORT Hurricanes Irma and Maria in Puerto Rico (FEMA P-2020, October 2018), found that structures formally built to Puerto Rico’s standards withstood the hurricanes without major structural damage. The programme was born from that: OGPe, in collaboration with FEMA, developed prescriptive design plans — safe model plans compliant with the building codes — and made them available to qualifying families, to support the construction of affordable housing without the citizen having to pay for the plans. There are four modular social-interest housing models, in one or two storeys, in cement, in wood and in a combination of materials. The main module is a single-storey house of 20 by 24 feet with two bedrooms, living-dining room, kitchen, bathroom and balcony, and two modules of 10 by 24 feet each can be added: with all the modules, the house reaches up to five bedrooms and two bathrooms. What the programme does not include is the professional work: each family must take the plans to an engineering or architecture office so the house is sited on their lot and the final design requirements are met before applying for permits.

External link

Go to the official site

You'll leave MiPRFácilOpens in a new tab

www.permisos.pr.gov

What is it?

It is a free set of base plans, so you do not start from zero. A construction plan is normally drawn by an architect or engineer for a fee, and for a family wanting to build a modest house that cost can be the difference between building with a permit and building informally. Safe Plans removes that line item: OGPe publishes the four already-designed, code-compliant models. What is still needed is a licensed professional to site the model on your specific lot — because a generic plan does not know where your land is, what slope it has or where the water runs — and who then files the Consolidated Construction Permit. Watch the name: on the same OGPe portal there is a filing called Authorization of Safe Plans (APS), which is a different thing. The APS is the filing by which a government entity, corporation, municipality, architect or engineer submits a plan to OGPe for approval so it can be repeated across different lots, and it costs one hundred dollars per individual residential model. That is not the filing of the family downloading the free models.

Who can do it?

OGPe says the plans are made available to qualifying families, but that page does not publish the qualification criteria: it does not state a maximum income, nor a lot-ownership condition, nor a first-home requirement. This guide does not invent them. If you want to know whether you qualify, write to planosseguros@ddec.pr.gov, the address OGPe itself gives for more information about the programme. What is published is a use restriction, and it is categorical: these plans are not for commercial use or for sale.

Requirements

Documents you need

Cost

Downloading the four Safe Plans models is free. Not to be confused with the Authorization of Safe Plans (APS), which is a different filing: OGPe’s manual sets its filing cost at $100 per individual residential model. The fees of the engineer or architect who sites the house on your lot, and the cost of the Consolidated Construction Permit, are not published in these sources.

Verified against the official source · August 15, 2026

Step by step

  1. Step 1: Choose among the four models

    The project consists of four modular social-interest housing models, identified as Model A, B, C and D. They come in one or two storeys, and in cement, in wood and in a combination of materials. They are modular designs: in a planned way and with a professional’s assistance, modules with more bedrooms can be added. The main module is a single-storey house of 20 by 24 feet with two bedrooms, living-dining room, kitchen, bathroom and balcony. Two modules can be added, of 10 by 24 feet each. If a family uses the plans with all the modules, the house would have up to five bedrooms and two bathrooms.

  2. Step 2: Download the files, and be ready for their size

    Each model is published in two formats at docs.pr.gov: the PDF documentation and the AutoCAD plans compressed into a .rar file. The four models’ PDFs weigh between 8.5 and 10.5 megabytes. The AutoCAD files are far bigger: between 102 and 143 megabytes each. If you are on mobile data, download the PDF and leave the AutoCAD to your engineer, who is the one who will use it; the .rar also requires a program to decompress it. A note on content: the Model A documentation is a 162-page PDF with no text layer, that is, drawing sheets. It is not a manual with written instructions, it is the plans.

  3. Step 3: Take the plan to a licensed engineer or architect

    OGPe says it plainly: it will be each family’s responsibility to complete the construction-plan design process with the professional advice of a licensed engineer or architect. You must take these safe plans to an engineering or architecture office so they site the house on your lot and meet the final design requirements prior to applying for construction permits. That step is neither optional nor decorative: the model plan does not contemplate your land, and the final design requirements depend on where you are going to build.

  4. Step 4: The professional files the Consolidated Construction Permit

    Once the plans are certified, the licensed professional will file a Consolidated Construction Permit (PCOC) with OGPe and complete the corresponding permitting through the Single Business Portal digital platform. You do not file it: it is filed by the licensed professional who certified the plans. And there is something worth knowing before counting on a date: the PCOC manual says that projects classified as Green Projects or Safe Plans Projects will not be considered ministerial. That means your permit cannot take the fast route a private Authorized Professional can sign, but rather OGPe’s regular evaluation flow, and that the system will charge you 10% of the total first and the remaining 90% after the analyst validates.

  5. Step 5: Do not confuse the programme with the APS filing

    The Authorization of Safe Plans (APS) is a separate filing, and its manual describes it thus: OGPe grants this approval as a stage ahead of filing the construction permit application, where the projects involve series construction of buildings or structures or their repetition across different lots, so that those details and documents need not later be filed for each individual lot. Who may file it: any government entity, corporation, municipality, architect or engineer authorized to practise. The filing cost is one hundred dollars per individual residential model. And a detail worth knowing: the manual says approved safe plans will be displayed and available at OGPe in digital format with the owners’ or proponents’ information, indicating whether they carry any cost so interested parties can access them. That is, there are approved safe plans that do cost, because their owner set a price on them. The four models of the FEMA and OGPe programme do not.

Where to do it

The four models are downloaded from the Safe Plans section of permisos.pr.gov, which links to files hosted at docs.pr.gov. For more information about the programme, OGPe gives the email planosseguros@ddec.pr.gov. The Consolidated Construction Permit is filed by your licensed professional through the Single Business Portal.

How long it takes

Check the current processing time with the official agency.

What to do if something goes wrong

First, what is not published. The page says the plans are made available to qualifying families, but publishes no qualification criterion: not income, not lot ownership, not family size. This guide does not invent them; write to planosseguros@ddec.pr.gov and ask. Nor is it published how long any step takes, or what an engineer charges to site the model on your lot, or what the Consolidated Construction Permit costs. Second, what was not read: the model documentation consists of PDFs of more than 150 pages with no text layer — drawing sheets — and this guide describes the programme, not the technical content of those sheets. Third, the name confusion: if you search “planos seguros” you will find the APS manual, which says one hundred dollars per model. That is the filing by the professional who submits a plan for approval, not that of the family downloading the free models. Fourth, the file sizes: each model’s AutoCAD exceeds 100 megabytes and comes as a .rar; do not try to download it on a phone. Fifth: the use restriction is express. These plans are not for commercial use or for sale. And sixth, something that is not on the programme page but in the Consolidated Construction Permit manual: projects classified as Safe Plans Projects will not be considered ministerial. That is, using the free models saves you the plan but leaves you outside the ministerial route a private Authorized Professional can sign; your permit goes through OGPe’s regular evaluation flow.

Common mistakes

  • Believing Safe Plans cost $100: that is the APS filing fee, filed by a professional, not the download of the models.
  • Thinking that with the downloaded plan you can already apply for the permit: a licensed engineer or architect must site the house on your lot.
  • Building from the model as-is, without adapting it to the land or to the final design requirements.
  • Using the plans for a commercial project or reselling them, when OGPe expressly prohibits it.
  • Downloading the AutoCAD file on a phone without knowing it weighs over 100 megabytes and comes compressed as .rar.
  • Assuming qualification criteria OGPe does not publish instead of writing to planosseguros@ddec.pr.gov and asking.
  • Expecting the model PDF to carry written instructions: they are plan sheets.
  • Counting on the fast ministerial route: the PCOC manual expressly excludes Safe Plans Projects.

Frequently asked questions

Are they really free?

The plans are. OGPe says base plans are made available to qualifying families to support the construction of affordable housing without the citizen having to pay for construction plans. What is not free is the work of the engineer or architect adapting them to your lot, nor the construction permit.

What size house comes out of these plans?

The main module is a single-storey house of 20 by 24 feet with two bedrooms, living-dining room, kitchen, bathroom and balcony. Two modules of 10 by 24 feet each can be added; with all of them, the house reaches up to five bedrooms and two bathrooms.

Can I file the permit myself with these plans?

Not according to what OGPe publishes. Once the plans are certified, it is the licensed professional who files the Consolidated Construction Permit through the Single Business Portal.

Does using the free plans speed up my permit?

No, quite the opposite. The Consolidated Construction Permit manual says projects classified as Green Projects or Safe Plans Projects will not be considered ministerial, so your permit follows OGPe’s regular evaluation flow instead of the route an Authorized Professional can sign. It shows in the payment: the system charges 10% first and the remaining 90% after the analyst’s validation.

Who qualifies for the programme?

OGPe says the plans are made available to qualifying families, but does not publish the criteria on that page. This guide does not invent them. Write to planosseguros@ddec.pr.gov, the contact OGPe itself gives for the programme.

Official sources

These are the government pages this guide is based on.

Last verified

August 15, 2026

MiPRFácil is an independent informational website and is not affiliated with, endorsed by, or operated by the Government of Puerto Rico or any government agency.

MiPRFácil does not submit applications on your behalf.

Was this guide helpful?

Did you find out-of-date information?

Did you find out-of-date information?

No account needed. We don't ask for personal data.