“That product is not approved in Puerto Rico”: the filing that approves it

Last reviewed: August 15, 2026VerifiedOGPe

In short

The System or Product Approval (ASP) is, according to OGPe’s manual, an approval issued by the agency certifying that the system or product meets the minimum quality and the standards or requirements demanded by the current Building Code. It is the filing behind a phrase heard constantly on site: that a given material, roofing system or panel is not approved in Puerto Rico. The manual asks for three things: general information on the system or product plus its specifications, compliance with the Building Code in force in Puerto Rico, and information on the specialist certifying the system or product. The documents are five: technical specifications of the system, structural calculations of the system, construction tests, certification of compliance with the building code — which is mandatory — and the certification of the system or product provided by another jurisdiction or recognised authority. That last document is often what decides the case: a product already approved in another jurisdiction brings that approval with it. The filing cost is $1,500, and the application stays open a maximum of thirty days to complete it.

The yardstick for this approval is the Building Code in force in Puerto Rico, which is adopted and updated separately. Confirm with OGPe which edition of the Code governs before preparing the technical file.

External link

Go to the official site

You'll leave MiPRFácilOpens in a new tab

docs.pr.gov

What is it?

It is an approval of the product, not of the works. When someone wants to bring into Puerto Rico a construction system or product the Building Code does not contemplate directly — a panel system, a type of anchor, a roofing material, a new technology — OGPe evaluates whether that system or product meets the minimum quality and standards the Code demands. Once the system is approved, it stops being a case-by-case argument at every permit. The filer is normally the manufacturer, importer or distributor, not a homeowner. But it is useful for the homeowner to know the filing exists: if a contractor tells you the product you want to use is not approved, there is a formal route to find out whether that is true and to have it approved.

Who can do it?

The manual does not restrict who may file by profession or entity type, and this guide does not add a requirement the source does not impose. What it does require is information on the specialist certifying the system or product, so a specialist technically backing the application is needed. The substantive criterion is a single written one: compliance with the Building Code in force in Puerto Rico.

Requirements

Documents you need

Cost

The filing cost for a system or product approval application is $1,500. It does not include the fees of the specialist certifying the system, the construction tests or the structural calculations, which the manual does not price.

Verified against the official source · August 15, 2026

Step by step

  1. Step 1: Check this is your filing and not the $50 one

    OGPe has two approvals whose descriptions match almost word for word and whose prices differ thirtyfold. The Renewable Energy Equipment Certification (CER) certifies that equipment meets the minimum quality and standards demanded by current regulation for use in installations in Puerto Rico, and costs $50 for new equipment. The System or Product Approval (ASP) certifies that a system or product meets the minimum quality and standards demanded by the current Building Code, and costs $1,500. If yours is panels, inverters, batteries, charge controllers, wind turbines or solar heaters, your filing is the CER. If yours is a system or product measured against the Building Code, it is the ASP.

  2. Step 2: Look for whether the product is already approved elsewhere

    The fifth document on the list is the certification of the system or product provided by another jurisdiction or recognised authority. If the product has already passed an evaluation elsewhere — another state, another country, a recognised body — that certification goes into the file and is probably the strongest thing you can present. Obtain it before commissioning fresh testing.

  3. Step 3: Gather the technical side: specifications, calculations and tests

    The technical file is three pieces: the system’s technical specifications, the system’s structural calculations and the construction tests, all accepted in PDF or MS Word. To that is added the certification of compliance with the building code, which the manual marks as mandatory, and the information on the specialist certifying the system or product. Without a specialist there is nobody to sign compliance, and without signed compliance there is no approval.

  4. Step 4: Budget $1,500 in filing fees and thirty days on the clock

    The filing cost for a system or product approval application is $1,500. It is the highest fee among the OGPe filings covered on this site, and it does not include the cost of producing the technical file. Separately the clock runs: the service application will remain open for a maximum term of thirty days to complete it, and once that term passes without completion or without all required documents uploaded, the process must begin again. With a file this size, that term is easily lost if you open the application before the documents are ready.

Where to do it

The System or Product Approval is filed in OGPe’s Single Business Portal. The applicant manual is published in the Information Sources section of permisos.pr.gov, alongside the rest of the filing manuals.

How long it takes

Check the current processing time with the official agency.

What to do if something goes wrong

What is not published in this source, and this guide does not invent: the manual does not say how long OGPe takes to resolve, how long the approval lasts once granted, whether it must be renewed, or whether there is a public list of already-approved systems and products a contractor could check before telling you something is not approved. Nor does it say what qualifications the certifying specialist must hold, or which authorities count as recognised for the fifth document. All of that must be asked of OGPe. A note on method: the $1,500 is the filing, not the whole process. The construction tests and structural calculations are produced by a third party and paid separately. And the most expensive mistake is one of identification: if your product is renewable energy equipment, your filing costs $50 and not $1,500, so confirm which one applies before paying.

Common mistakes

  • Filing a $1,500 ASP for renewable energy equipment, whose filing is the $50 CER.
  • Budgeting only the filing fee: tests, calculations and the specialist are separate.
  • Opening the application before the technical file is ready and losing the thirty-day term.
  • Filing without the certification of compliance with the building code, which is mandatory.
  • Not supplying the product certification from another jurisdiction when one exists.
  • Simply accepting that a product “is not approved” without checking whether someone has already obtained approval.
  • Confusing product approval with a construction permit: it approves the system, not the works.

Frequently asked questions

My contractor says the product I want is not approved in Puerto Rico. What do I do?

There is a formal filing to approve it: OGPe’s System or Product Approval, certifying that the system or product meets the minimum quality and standards demanded by the current Building Code. It is normally filed by the manufacturer, importer or distributor. The manual publishes no list of already-approved products, so to find out whether yours is approved you must ask OGPe.

How much does it cost?

The filing cost is $1,500. Separately go the fees of the specialist certifying the system, the construction tests and the structural calculations, which the manual does not price.

My product is already approved in the United States. Does that help?

The manual lists among the documents the certification of the system or product provided by another jurisdiction or recognised authority. What the manual does not say is whether that certification alone suffices or whether calculations and tests must be supplied anyway; this guide does not assume it.

Official sources

These are the government pages this guide is based on.

Last verified

August 15, 2026

MiPRFácil is an independent informational website and is not affiliated with, endorsed by, or operated by the Government of Puerto Rico or any government agency.

MiPRFácil does not submit applications on your behalf.